1m³ → $1.40 first 40 m³ → 40 x 1.4 = $56
remaining ($) → 89 - 56 = $33 remaining (m³) → 60 - 40 = 20m³
20m³ → $33 1m³ → 33 ÷ 20 = $1.65
The table shows the water charges.Mr Chan paid $89 for using 60 m³ of water.How much did he pay per cubic metre for water consumption more than 40 m³? (2 marks)
Answer: $ 1.65
Loading drawing…
Loading drawing…
1m³ → $1.40 first 40 m³ → 40 x 1.4 = $56
remaining ($) → 89 - 56 = $33 remaining (m³) → 60 - 40 = 20m³
20m³ → $33 1m³ → 33 ÷ 20 = $1.65