Independent solution; the supplied answer section omits this question. Together the machines pack 5 + 2 = 7 boxes per minute. Time to pack 175 boxes = 175 ÷ 7 = 25 minutes. The start time 12.50 a.m. is 00:50. Adding 25 minutes gives 01:15, or 0115 hours.
Check: in 25 minutes Machine A packs 5 × 25 = 125 boxes and Machine B packs 2 × 25 = 50 boxes. Their total is 175.